2009 Impact Evaluation of San Diego Gas & Electric's Participating Load Pilot Program, Part 1. Ex Post Final Report

Categories: Demand Response, Program Evaluation -    View PDF

September 17, 2010 - Dan Hansen and Dave Armstrong

Dan Hansen

Dan Hansen

Steve Braithwait

Steve Braithwait

Jess Reaser

Jess Reaser

Dave Armstrong

Dave Armstrong

This report describes several analyses conducted in association with a load impact evaluation of San Diego Gas and Electric Company’s (“SDG&E”) Participating Load Pilot (“PLP”) Program during the 2009 program year. These analyses include estimation of ex post load impacts for each PLP event, a summary and description of the 1-minute telemetry data collected for the two PLP aggregators, and an assessment of the performance of the “meter-before/meter-after” baseline method that is used by the California ISO (CAISO) to confirm performance during events.

Citation & Download

Steven D. Braithwait, Dan Hansen, David Armstrong, Jess Reaser, 2009 Impact Evaluation of San Diego Gas & Electric’s Participating Load Pilot Program, Part 1. Ex Post Final Report, September 17, 2010.